Bathroom Remodeling Timeline: What to Expect from Start to Finish

JB Thompson • Nov 06, 2023

This is a subtitle for your new post

Bathroom Remodeling Timeline

Bathroom remodeling sounds fun, and the idea of getting a new bathroom is exciting. However, did you think about how long it will take or how long you won’t be able to use the bathroom?

It is a very important question that you must ask your contractor and understand the timeline and various stages involved in the process. Whether it is a small change in your bathroom or a complete makeover of your master bathroom, you must consult a seasoned contractor so you can have some realistic expectations from your bathroom remodeling. It helps reduce stress and allows you to plan accordingly. 

In this blog, you will go through a typical bathroom remodeling timeline from start to finish.

Planning

You might think that the planning is the easiest part, but it isn’t. You can’t decide that you need a bathroom remodel today and start on it the next day. The planning sets the foundation for your bathroom remodel. During this time, you will set the scope of your project and a budget and finalize the minute things. It roughly takes approx. 2-6 weeks.


During this time, you:


  • Define your goals and priorities
  • Look for expert contractors, such as Garot Plumbing, unless you aim for a DIY remodel.
  • Create a new layout for your bathroom
  • Selecting Materials and fixtures



Initial Inspection

Initial inspection by a seasoned expert is crucial. You can share your insights and learn the right estimate for your remodel project. Experts know the additions you can make without approval and help you with their experience. Some contractors don’t charge the inspection costs and waive them against the overall remodel costs. Though, you must read the contract carefully to check for any hidden costs and expenses.



Permits and Approvals

Depending on your location and the proposed changes, you must obtain the required permits and approvals for your bathroom remodel. For a bathroom remodel in Green Bay, Wisconsin, you must obtain a permit if your bathroom remodel involves changes to plumbing, electrical works, wiring, ventilation, floor plan, new additions or openings, etc. It might take approx. 2-4 weeks. 



Demolition

It is a heart-wrenching part where your old bathroom is demolished brick by brick. This phase involves removing the existing fixtures, tiles, and other elements you're replacing. The duration depends on the complexity of the project and the size of the bathroom. However, it does not take more than a week.



Rough-In

The rough-in phase is where the major changes to plumbing, electrical, and framing are made. It includes relocating or adding electrical outlets, running new plumbing lines, and framing for any structural changes or additions. It might take 1-2 weeks.



Inspection

After the rough-in is completed, it’s time for a preliminary inspection to ensure that everything complies with local building codes. The time involved in inspection varies, depending on the authorities.

Installation

Once the rough-in work passes inspection, the installation of new fixtures, cabinetry, tiles, and other components begins. The insulation and drywall are also installed at this stage. The bathroom really starts to take place at this stage.


Tile work is a skill that should only be performed by experts. Even if you are working on a DIY bathroom remodeling, it is advised that you hire a bathroom remodeling expert for the tile work. The experienced staff will install your floor tiles, backsplash, sink tiles, etc., with perfection.


All of it might take 2-3 weeks.



Final Inspections

A final inspection is crucial to ensure your bathroom is ready for use and all the functions are working properly. Also, ensure that the work meets safety and code standards. The time for final inspection varies.



Cleaning and Cleanup

A thorough cleanup is required before you can use the bathroom. It shall take at most 1 or 2 days.



Final Walkthrough

Inspect the completed space with your contractor and check if the space meets your expectations or not. You can address any issues at this time.



Final Words

Bathroom remodeling is a significant project, and understanding the timeline is crucial for a smooth and successful renovation. The specific timeline is based on the scope of the project, the size of the bathroom, and significantly on the contractor you have chosen for your bathroom remodel. Proper planning, open communication, and transparency with your contractor are essential for a successful bathroom remodeling project.


If you are looking for bathroom remodel experts in Green Bay, WI, you need Garot Plumbing, the expert remodeling contractors, for complete peace of mind. We have a staff of highly qualified professionals who will complete your bathroom in minimal time, offering you the best quality, and that too at a very affordable price.


Contact us today for your bathroom remodel needs!